{"id":18028,"date":"2025-01-15T09:25:00","date_gmt":"2025-01-15T15:25:00","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/7-21-09-002\/"},"modified":"2025-01-15T09:25:13","modified_gmt":"2025-01-15T15:25:13","slug":"7-21-09-002","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/7-21-09-002\/","title":{"rendered":"C.W. Worthington Middle School"},"excerpt":{"rendered":"

The C.W. Worthington Middle School project, built for Northwest Independent School District, included the new construction of a 220,980-square-foot, two-story middle school located in Haslet, TX. The new campus features a variety of athletic amenities, including a football field, running track, tennis courts, field event spaces, and a concessions building. The campus also includes a main gymnasium, cafeteria, classrooms, fine arts space, and an ICC 500-certified storm shelter which doubles as a practice gymnasium. The central library is the main focal point of the new academic building. Dressed with state-of-the-art technology and flexible furniture, the space is designed to holistically blend group learning and private study, and to support large student gatherings. The new campus was built upon a concrete foundation and features a structural steel frame, a masonry exterior, and a built-up roof.<\/p>\n","protected":false},"featured_media":18053,"template":"","project_types":[55],"class_list":["post-18028","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/18028","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/18028\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/18053"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=18028"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=18028"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}