{"id":17638,"date":"2025-01-15T09:29:06","date_gmt":"2025-01-15T15:29:06","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/7-19-01-005\/"},"modified":"2025-01-15T09:29:14","modified_gmt":"2025-01-15T15:29:14","slug":"7-19-01-005","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/7-19-01-005\/","title":{"rendered":"Emerson High School"},"excerpt":{"rendered":"

The Emerson High School project, built for the Frisco Independent School District, included the new construction of a two-story, 380,000-square-foot high school building which accommodates 2,100 students in McKinney, Texas. The facility houses academics, fine arts, an auditorium, food services, dining, music, a library, athletics, and administration. The project also includes a football field, baseball and softball fields with artificial turf, practice fields, an eight lane track, eight tennis courts, an athletic field house, a concession building, and a ticket booth. The Emerson High school project was the first Frisco Independent School District facility to include a storm shelter. The 13,787-square-foot ICC 500 certified storm shelter serves a dual role as the gymnasium, has the ability to house 2,335 people, and is equipped with a central battery system. The building was constructed on a slab-on-grade foundation with an insulated concrete form structure with steel joists, a masonry exterior, and a modified bitumen roof. Emerson High School now provides a state-of-the-art learning facility for high school students and an area of refuge in the McKinney community.<\/p>\n","protected":false},"featured_media":13842,"template":"","project_types":[55],"class_list":["post-17638","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17638\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/13842"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17638"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}