{"id":17637,"date":"2025-03-13T15:39:49","date_gmt":"2025-03-13T20:39:49","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/7-20-01-001\/"},"modified":"2025-03-13T15:39:49","modified_gmt":"2025-03-13T20:39:49","slug":"7-20-01-001","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/7-20-01-001\/","title":{"rendered":"Frisco Independent School District Bruce Eubanks Natatorium Expansion"},"excerpt":{"rendered":"

The Frisco Independent School District Bruce Eubanks Natatorium expansion involved the new construction of a 48,000-square-foot practice facility adjacent to the existing complex in Frisco, TX. In addition to serving as the District\u2019s athletic department headquarters, this project includes a 50-meter practice pool, a multipurpose space with retractable walls to accommodate up to 250 people, and a Hall of Honor to recognize current students and alumni. The project was constructed on a concrete foundation supported by footings with a structural frame comprised of the pre-engineered metal building and structural steel, a masonry and metal panel exterior, and a single-ply roof. This thoughtfully designed expansion effectively doubled the pool and locker room capacities, offering students and faculty a modern and functional environment.<\/p>\n","protected":false},"featured_media":13784,"template":"","project_types":[55],"class_list":["post-17637","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17637","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17637\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/13784"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17637"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}