{"id":17625,"date":"2025-01-15T12:34:04","date_gmt":"2025-01-15T18:34:04","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/5-17-01-007\/"},"modified":"2025-01-15T12:34:22","modified_gmt":"2025-01-15T18:34:22","slug":"5-17-01-007","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/5-17-01-007\/","title":{"rendered":"Boulder City High School Replacement Phase III – Performing Arts Center"},"excerpt":{"rendered":"
The Boulder City High School Replacement Phase III – Performing Arts Center project, built as part of a complete, phased replacement of the campus for Clark County School District, included selective demolition and the new construction of a two-story, 21,830-square-foot theatrical complex on the active campus of Boulder City High School located in Boulder City, NV. The facility houses a drama room, a music room, a multimedia production studio, and a 400-seat capacity auditorium with a stage and associated storage. The project also featured the demolition of the existing student parking lot and the construction of a new parent\/staff parking lot in a different area on the school’s campus. The performing arts center was constructed on a slab-on-grade concrete foundation with a masonry and steel structural frame. A masonry exterior and a steel joist TPO roof completed the construction. The Boulder City High School Replacement Phase III – Performing Arts Center project completed the campus replacement and now offers its students, faculty, and staff a modern, state-of-the-art high school campus which will serve the community for years to come.<\/p>\n","protected":false},"featured_media":9563,"template":"","project_types":[55],"class_list":["post-17625","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17625\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/9563"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17625"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}