{"id":17607,"date":"2025-01-15T11:19:56","date_gmt":"2025-01-15T17:19:56","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/1-20-01-018\/"},"modified":"2025-01-15T11:20:19","modified_gmt":"2025-01-15T17:20:19","slug":"1-20-01-018","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/1-20-01-018\/","title":{"rendered":"Schnepf Elementary School No. 9"},"excerpt":{"rendered":"

The Schnepf Elementary School No. 9 project, built for Queen Creek Unified School District, included the new construction of a two-story, 69,425-square-foot campus in Queen Creek, AZ. The campus featured a classroom building housing kindergarten through sixth grade, a smart laboratory\/science, technology, engineering, and math (STEM) area, a multipurpose building with administrative offices, and a cafeteria\/gymnasium combination space with a stage and music rooms. The project also featured two parking lots to separate parent drop-off and bus traffic, three playground areas, and a large grass and hardscape courtyard area. The elementary school was constructed on a concrete foundation supported by footings with a structural frame comprised of concrete masonry unit block and steel, an exterior comprised of masonry and metal panels, and a single-ply roof.<\/p>\n","protected":false},"featured_media":13798,"template":"","project_types":[55],"class_list":["post-17607","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17607","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17607\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/13798"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17607"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}