{"id":17604,"date":"2025-01-15T11:24:28","date_gmt":"2025-01-15T17:24:28","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/1-20-01-002\/"},"modified":"2025-01-15T11:24:45","modified_gmt":"2025-01-15T17:24:45","slug":"1-20-01-002","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/1-20-01-002\/","title":{"rendered":"Goodyear Fire Station No. 181"},"excerpt":{"rendered":"

The City of Goodyear Fire Station No. 181 project included the new construction of a 16,126- square-foot facility on a 4.6-acre site in Goodyear, AZ. The project entails three apparatus bays, nine dormitories, firefighter offices, captain’s offices, a day room, a dining room, a fitness center, a lobby, and a decontamination corridor. The fire station was built on a concrete foundation with a load-bearing masonry structural frame, a masonry, and exterior insulation and finish system (EIFS), and a metal panel and single-ply roof.<\/p>\n","protected":false},"featured_media":13829,"template":"","project_types":[113],"class_list":["post-17604","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-civic"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17604\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/13829"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17604"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}