{"id":17589,"date":"2025-01-15T14:29:24","date_gmt":"2025-01-15T20:29:24","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/5-11-03-010\/"},"modified":"2025-01-15T14:29:38","modified_gmt":"2025-01-15T20:29:38","slug":"5-11-03-010","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/5-11-03-010\/","title":{"rendered":"John F. Miller School"},"excerpt":{"rendered":"
The John F. Miller School project, built for the Clark County School District, included the new construction of a 73,496-square-foot school located in Las Vegas, NV. The facility houses 120 students with disabilities, ages three- to 22 years. This project features protected outdoor courtyards with extra daylighting and play opportunities, wide hallways to accommodate wheelchair or walking equipment, wheelchair swings, medical offices, and a library. The school was constructed with a tilt-up panel structure, exterior metal cladding, and a tactile surface, visual stimuli equipped interior. The John F. Miller School now provides the largest health care office in the school district for medically fragile and disabled students.<\/p>\n","protected":false},"featured_media":13558,"template":"","project_types":[55],"class_list":["post-17589","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17589\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/13558"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17589"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}