{"id":17516,"date":"2025-01-15T11:19:30","date_gmt":"2025-01-15T17:19:30","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/1-19-01-004\/"},"modified":"2025-01-15T11:19:44","modified_gmt":"2025-01-15T17:19:44","slug":"1-19-01-004","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/1-19-01-004\/","title":{"rendered":"Town of Gilbert Public Safety Training Facility"},"excerpt":{"rendered":"
The Town of Gilbert Public Safety Training Facility project included the new construction and an 18-acre, 150,000-square-foot village-style tactical training campus for police and fire and a 36-acre tactical drive training area located in Gilbert, AZ. The facility provides long-term support for Gilbert\u2019s public safety training needs and regional training efforts. The tactical training campus features an amphitheater, locker rooms, administrative offices, classrooms, a three-bay mock fire station, several burn buildings, and indoor shooting ranges with traditional lanes and a custom streetscape. The adjacent tactical drive training area consists of a driving course, an evasive maneuver course, and a driving skills pad within a retention area that is part of an easement granted to the Town of Gilbert by the Maricopa County Flood Control District. The facility was constructed on a concrete foundation supported by footings, a structural frame consisting of load-bearing masonry, mild reinforced steel concrete, and steel, a masonry and metal panel exterior, and a tile metal panel roof.<\/p>\n","protected":false},"featured_media":13588,"template":"","project_types":[113],"class_list":["post-17516","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-civic"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17516","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17516\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/13588"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17516"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17516"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}