{"id":17490,"date":"2025-01-16T02:09:41","date_gmt":"2025-01-16T08:09:41","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/8-13-02-990\/"},"modified":"2025-01-16T02:09:45","modified_gmt":"2025-01-16T08:09:45","slug":"8-13-02-990","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/8-13-02-990\/","title":{"rendered":"University of Illinois Integrated Bioprocessing Research Lab"},"excerpt":{"rendered":"
The Integrated Bioprocessing Research Lab project, completed for the University of Illinois, included the new construction of a two-story, 42,000-square-foot research laboratory facility on the university’s campus in Urbana, IL. The facility houses a 9,000-square-foot processing space for agricultural research, state-of-the art teaching spaces, and analysis laboratories for biotechnology, fermenting, corn milling, and soy bean processing. These laboratories house cutting-edge equipment for analysis, deconstruction, fermentation, and thermo-chemical processes. The project also features high bay spaces, analytic laboratory spaces, classrooms, administrative spaces, specialized laboratory equipment for co-product evaluation and optimization of cellulosic material into energy, and biomass pre-treatment skids. This project achieved LEED Silver Certification from the U.S. Green Building Council for low-emitting materials including adhesives and sealants. Construction consisted of a cast-in-place concrete foundation, a steel structural frame, masonry exterior, and a single ply roof. Due to CORE\u2019s implementation of a design by Bailey Edward, the Integrated Bioprocessing Research Lab project has increased bio-energy value for the application of innovative discoveries for small production and commercial markets of bio-fuels.<\/p>\n","protected":false},"featured_media":14138,"template":"","project_types":[59],"class_list":["post-17490","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-higher-education"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17490\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/14138"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17490"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}