{"id":17438,"date":"2025-01-15T10:09:57","date_gmt":"2025-01-15T16:09:57","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/5-19-01-008\/"},"modified":"2025-01-15T10:10:10","modified_gmt":"2025-01-15T16:10:10","slug":"5-19-01-008","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/5-19-01-008\/","title":{"rendered":"Betty Engelstad School of Health and Sciences"},"excerpt":{"rendered":"
The Betty Engelstad School of Health and Sciences project, built for the State Public Works Division, the College of Southern Nevada, and Nevada State College, included the new construction of a three-story, 73,079-square-foot educational facility located on the College of Southern Nevada’s campus in Henderson, NV. The facility features modern medical laboratories, advising offices, a campus library, simulation laboratories, classrooms, a demonstration garden, a conference space, and collaborative study areas for students. The project also includes building systems comprised of a four-pipe hydronic heating and cooling, lab air valve exhaust, biological safety cabinets, fume hoods, and specific, measurable, appropriate, realistic, and timebound classroom walls. The building was constructed on a concrete foundation supported by footings with a structural frame comprised of cold-formed metal, load-bearing masonry, and structural steel, an exterior insulation and finish system, masonry, and siding exterior, and a single-ply roof.<\/p>\n","protected":false},"featured_media":14374,"template":"","project_types":[113],"class_list":["post-17438","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-civic"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/17438\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/14374"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=17438"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=17438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}