{"id":16537,"date":"2025-01-15T09:59:07","date_gmt":"2025-01-15T15:59:07","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/1-16-01-003-2\/"},"modified":"2025-01-15T09:59:20","modified_gmt":"2025-01-15T15:59:20","slug":"1-16-01-003","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/1-16-01-003\/","title":{"rendered":"City of Mesa Regional 911 Dispatch Facility"},"excerpt":{"rendered":"

The City of Mesa Regional 911 Dispatch Facility project included the renovation of a 14,821-square-foot municipal dispatch and Emergency Operations Center located in Mesa, AZ. The facility houses the city\u2019s fire and medical emergency communications services and supports workstations, office space, a fire training room, a nursing station, and a \u201cquiet room\u201d for dispatchers. The project also features a large panel video wall, an upgraded server room, emergency generators, and a UPS set. The emergency dispatch center was constructed utilizing a slab-on-grade concrete foundation, a tilt-wall concrete structural frame and pre-engineered metal building exterior, and roofing materials consisting of SBS membrane, foam, metal, and PVC. Construction also included the installation of an eight-foot site wall around the perimeter, millwork additions, and an aluminum storefront. The City of Mesa Regional 911 Dispatch Facility now provides increased emergency support to the community.<\/p>\n","protected":false},"featured_media":14231,"template":"","project_types":[113],"class_list":["post-16537","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-civic"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/16537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/16537\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/14231"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=16537"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=16537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}