{"id":16525,"date":"2025-01-15T10:54:26","date_gmt":"2025-01-15T16:54:26","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/1-14-02-023-2\/"},"modified":"2025-01-15T10:54:31","modified_gmt":"2025-01-15T16:54:31","slug":"1-14-02-023","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/1-14-02-023\/","title":{"rendered":"Maricopa Institute of Technology"},"excerpt":{"rendered":"

The Maricopa Institute of Technology project, built for the Riverside Elementary School District No. 2, included the new construction of a 61,656 square foot middle school located in Phoenix, AZ. The facility supports classrooms designed to accommodate the Science Technology Engineering Math high school preparatory curriculum and 600 students on a 14-acre site. The middle school was constructed on a concrete foundation with structural steel and concrete walls, an exterior insulation and finish system, an insulated water-resistant, finished surface, metal panels, and masonry, and a sheet metal and thermoplastic polyolefin material. The project also features an Energy Management System consisting of computer-aided control and monitoring tools for building performance optimization and maximum energy savings, a central atrium serving as a cafeteria and student assembly area, an exterior amphitheater, and breakout spaces for collaborative and individual study. The Maricopa Institute of Technology project now provides a unique learning environment for students.<\/p>\n","protected":false},"featured_media":9816,"template":"","project_types":[55],"class_list":["post-16525","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/16525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/16525\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/9816"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=16525"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=16525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}