{"id":16519,"date":"2025-01-15T21:54:05","date_gmt":"2025-01-16T03:54:05","guid":{"rendered":"https:\/\/coreconstruction.com\/projects\/3-13-03-002-2\/"},"modified":"2025-01-15T21:54:10","modified_gmt":"2025-01-16T03:54:10","slug":"3-13-03-002","status":"publish","type":"projects","link":"https:\/\/coreconstruction.com\/projects\/3-13-03-002\/","title":{"rendered":"Dr. Martin Luther King Jr. Charter High School"},"excerpt":{"rendered":"

The Dr. Martin Luther King Jr. Charter High School project, built for the Louisiana Department of Education Recovery School District, included the new construction of a three-story, 139,000-square-foot high school located in New Orleans, LA. The campus supports kindergarten through 12th grade and includes classrooms, laboratories, a gymnasium, and a theater. The project achieved LEED Silver Certification from the U.S. Green Building Council for the implementation of state-of-the art electrical and emergency systems in addition to sustainable green energy systems. The high school was constructed using a concrete and structural steel frame on a pre-cast concrete and timber piles foundation. The exterior features concrete masonry unit block with brick veneer and composite wall panels, and a built-up flat roof system. The Dr. Martin Luther King Jr. Charter High School now provides a fully modernized facility for academic student instruction in the community of the Lower Ninth Ward of New Orleans.<\/p>\n","protected":false},"featured_media":9643,"template":"","project_types":[55],"class_list":["post-16519","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_types-k12"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/16519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/projects\/16519\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/9643"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=16519"}],"wp:term":[{"taxonomy":"project_types","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/project_types?post=16519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}