{"id":10191,"date":"2020-11-12T21:02:36","date_gmt":"2020-11-13T03:02:36","guid":{"rendered":"https:\/\/coreconstprod.wpengine.com\/news\/asu-celebrates-grand-opening-of-lantana-hall-on-polytechnic-campus\/"},"modified":"2021-12-09T13:29:55","modified_gmt":"2021-12-09T19:29:55","slug":"asu-celebrates-grand-opening-of-lantana-hall-on-polytechnic-campus","status":"publish","type":"news","link":"https:\/\/coreconstruction.com\/news\/asu-celebrates-grand-opening-of-lantana-hall-on-polytechnic-campus\/","title":{"rendered":"ASU celebrates grand opening of Lantana Hall on Polytechnic campus"},"content":{"rendered":"

Arizona State University is celebrating the official grand opening of\u00a0Lantana Hall<\/a>\u00a0\u2014 the university\u2019s newest residence hall, which opened in fall 2020 on the Polytechnic campus.<\/p>\n

The four-story, state-of-the-art facility, located on the north side of campus near Century Hall, not only provides 374 beds for the Polytechnic campus\u2019\u00a0growing student population<\/a>, it also contains about 8,500 square feet of academic space on the first floor, including two classrooms, multiple offices, conference rooms and lounge spaces conducive to a \u201clive-learn\u201d experience.<\/p>\n

In line with ASU\u2019s sustainability goals, Lantana Hall is on track to receive the highest certification from the\u00a0U.S. Green Building Council<\/a>: LEED Platinum. This would be ASU\u2019s first LEED Platinum-certified residence hall. The 113,821-square-foot building was constructed using a wooden frame and a concrete podium hybrid system with a shell including accent metal paneling and fiber cement board. Seventy-five percent of the waste generated during this project was diverted to recycling facilities. The project was completed on time and under budget.<\/p>\n

To read the full article as published by ASU Now, please CLICK HERE<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"

Arizona State University is celebrating the official grand opening of Lantana Hall \u2014 the university\u2019s newest residence hall, which opened in fall 2020 on the Polytechnic campus.<\/p>\n","protected":false},"author":1,"featured_media":10192,"template":"","news_tags":[87,94],"class_list":["post-10191","news","type-news","status-publish","has-post-thumbnail","hentry","news_tags-core1937","news_tags-corearizona"],"acf":[],"_links":{"self":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/news\/10191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/news\/10191\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media\/10192"}],"wp:attachment":[{"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/media?parent=10191"}],"wp:term":[{"taxonomy":"news_tags","embeddable":true,"href":"https:\/\/coreconstruction.com\/wp-json\/wp\/v2\/news_tags?post=10191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}